Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the google-analytics-dashboard-for-wp domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/functions.php on line 6121 Warning: Cannot modify header information - headers already sent by (output started at /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/functions.php:6121) in /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/rest-api/class-wp-rest-server.php on line 1896 Warning: Cannot modify header information - headers already sent by (output started at /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/functions.php:6121) in /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/rest-api/class-wp-rest-server.php on line 1896 Warning: Cannot modify header information - headers already sent by (output started at /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/functions.php:6121) in /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/rest-api/class-wp-rest-server.php on line 1896 Warning: Cannot modify header information - headers already sent by (output started at /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/functions.php:6121) in /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/rest-api/class-wp-rest-server.php on line 1896 Warning: Cannot modify header information - headers already sent by (output started at /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/functions.php:6121) in /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/rest-api/class-wp-rest-server.php on line 1896 Warning: Cannot modify header information - headers already sent by (output started at /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/functions.php:6121) in /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/rest-api/class-wp-rest-server.php on line 1896 Warning: Cannot modify header information - headers already sent by (output started at /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/functions.php:6121) in /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/rest-api/class-wp-rest-server.php on line 1896 Warning: Cannot modify header information - headers already sent by (output started at /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/functions.php:6121) in /customers/5/0/7/tobiasclarsson.com/httpd.www/wp-includes/rest-api/class-wp-rest-server.php on line 1896 {"id":786,"date":"2009-08-01T12:42:55","date_gmt":"2009-08-01T16:42:55","guid":{"rendered":"http:\/\/www.tobiasclarsson.com\/?p=786"},"modified":"2023-06-20T06:27:03","modified_gmt":"2023-06-20T06:27:03","slug":"development-of-product-service-systems-challenges-and-opportunities-for-the-manufacturing-firm","status":"publish","type":"post","link":"https:\/\/www.tobiasclarsson.com\/?p=786","title":{"rendered":"Development of product-service systems: challenges and opportunities for the manufacturing firm"},"content":{"rendered":"

Research paper published in Journal of Engineering Design.<\/p>\n

Abstract<\/strong><\/p>\n

\"Screenshots<\/a>

Screenshots of service integration in the engineering-design environment<\/p><\/div>\n

Product-Service Systems (PSS) raise interesting opportunities for the manufacturing firm as the function <\/em>is provided to meet customer needs rather than the physical hardware itself. PSS offerings based on the manufacturer\u2019s knowledge about the product and the technology can increase its status as problem-solver and solution-provider, reduce life cycle cost and produce high revenue. However, PSS including, e.g. hardware, services, software and electronics are efficient and competitive only if developed for the specific purpose with features such as easy to maintain, upgradeable, with built-in sensors for collecting in-use and service data, and easy to use. This changes the requirements on the manufacturing firm\u2019s development process. Looking back historically, the last century gives an interesting changing landscape of the rationale for the product-development methods used in manufacturing firms. This article, based on the previous research in the product- and service-development fields, and on empirical results from studies at several manufacturing firms, looks into how the engineering work is affected by PSS and how it can be enhanced for PSS, especially in terms of required competencies and other capabilities. It results in recommendations for a new, functional product-development process.<\/p>\n

Keywords<\/strong><\/p>\n