December 2021

ASPECT – A System for Electric and Connected Transport Solutions | 2021-2024

Project ASPECT aims to, based on learnings from pilot Electric-Site, lift the technology to an energy optimized solution to scale in both volume and size. Focus for this project is within confined area. The project includes design of energy infrastructure, electric system on machines and site management system. Furthermore it includes validation of digital infrastructure for system, method and requirements...

TRUST-SOS – TRUSTed – Site Optimisation Solutions | 2021-2024

In the project we are developing digitalized services to increase the level of trusted decision making to optimise overall site systems in off-road transport applications. By developing data-driven models for real-time simulation and optimisation of customer site operations, combined with advanced data analytics, we move from the current experience-based process to a model-based process that will enable us to deliver...

I-Stamp – Intelligent and sustainable stamping processes using hybrid control strategies together with process monitoring | 2021-2024

The machine tool investment for stamping (presses and tools) is cost intensive in the automotive industry. The machine tool investment for stamping (presses and tools) is cost intensive in the automotive sector. Maximizing return on investment (ROI) against these assets is crucial for maintaining a healthy bottom line. Additionally, minimizing the amount of scrap is necessary to become more competitive...